Abstract eng:
In the preparation of construction is very important to think and consider all the real circumstances affecting the implementation of the individual processes. One of the main headstones of a well-prepared civil-technology project is a proposal for lifting equipment, including tower cranes and their groups. It is one of the main items in the budget and may also be very important to speed up the process of construction. The main aim is the best combination of this two parameters. Therefore should be considered in the crane design the speed parameters too, because could have a significant impact on the final proposal.

Publisher:
Slovak University of Technology in Bratislava, Faculty of Civil Engineering, 2008
Conference Title:
Conference Title:
International Scientific Conference 70 Years of FCE STU
Conference Venue:
Bratislava (SK)
Conference Dates:
2008-12-04 / 2008-12-05
Rights:
Text je chráněný podle autorského zákona č. 121/2000 Sb.



Record appears in:



 Record created 2014-11-05, last modified 2014-11-18


Original version of the author's contribution as presented on CD, . :
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)