Projekt Zemplínska vodná cesta - hodnotenie efektívnosti


Abstract eng:
Canalization of Bodrog, Latorica and Laborec Rivers is planned in the Zemplín Waterway project. Total length of canalization is about 35 km. There have been 11 different variants of canalization developed in this project. Depending on the variant also design parameters of the fairway are varying, length adjustments, the degree of shipping, freight and passenger ports, etc. The article describes assessment methodology used to evaluate the Zemplín Waterway project effectivity.

Publisher:
Slovak University of Technology in Bratislava, Faculty of Civil Engineering, 2008
Conference Title:
Conference Title:
International Scientific Conference 70 Years of FCE STU
Conference Venue:
Bratislava (SK)
Conference Dates:
2008-12-04 / 2008-12-05
Rights:
Text je chráněný podle autorského zákona č. 121/2000 Sb.



Record appears in:



 Record created 2014-11-05, last modified 2014-11-18


Original version of the author's contribution as presented on CD, . :
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)