1.
|
In the Tokyo metropolitan area to a wide variety of capital function is concentrated, are many of the stranded commuters are expected to occur at the time of the ca [...]
|
2.
|
It is pointed out that both risk control and risk financing are needed to reduce the seismic risk. Since an earthquake insurance, which is the most popular measure, is li [...]
|
3.
|
In order to improve the accuracy of risk analysis, authors propose a seismic fragility analysis method using two ground motion intensity measures; peak ground acceleratio [...]
|
4.
|
Business continuity is now being regarded as an important factor in management of enterprises. Most of the enterprises are not stand-alone; they depend on Supply Chain (S [...]
|
5.
|
We propose the probabilistic seismic hazard map for the study of earthquake risk of spatially-spreaded facilities. This is introduced as the conditional seismic hazard ma [...]
|