1.
|
Constructed in 330-320 B.C., the stadium at Nemea, consists of the race track, the seating area, the vaulted entrance tunnel and the “Apodyterion”. The tunnel was dis [...]
|
2.
|
Constructed in 330-320 B.C., the stadium at Nemea, consists of the race track, the seating area, the vaulted entrance tunnel and the “Apodyterion”. The tunnel was dis [...]
|
3.
|
In the present contribution, a numerical simulation of the nonlinear behaviour of the Charles Bridge in Prague with the emphasis on the heterogeneous character of the mat [...]
|
4.
|
This contribution deals with the modeling of shells. One of the possible methods how to numerically model a shell is to approximate its curved surface by several plane ar [...]
|
5.
|
Hulla, J.
GEOTECHNICAL PROBLEMS OF THE STRUCTURES ON THE FLOODED TERRITORIES. During floods in the Slovak territory water levels in the rivers and river basins rise from 6 m to 10 [...]
|
6.
|
Witzany, J.
Long-term research has proven that the core of Charles Bridge shows a high moisture content by weight and is contaminated by soils (sulphates, nitrates, chlorides), which [...]
|