000022827 24500 $$aRecovery of some of waste gas derived from clinker production installation at Górażdże cement plant

000022827 24630 $$n24.$$pEngineering Mechanics 2018
000022827 260__ $$bInstitute of Theoretical and Applied Mechanics of the Cech Academy of Sciences, Prague
000022827 506__ $$arestricted
000022827 520__ $$2eng$$aThe process of clinker production, during which the principal component of cement is produced, generates considerable volumes of waste gas. This flow of gas in the rotary kiln forms an indispensable part of the clinker burning process. The hot gas at the exhaust of the clinker installation still has an adequately high temperature to enable its recovery in a process that is both feasible and profitable. As a consequence of the recovery and use of some of the energy in this gas, it will be possible to provide hot water to office and common spaces in the plant. The projected shell-and-tube heat exchanger was designed so as to condition the gas so that it achieves an adequate temperature that can be applied to reduce the cost of central heating and provide network hot water production.

000022827 540__ $$aText je chráněný podle autorského zákona č. 121/2000 Sb.
000022827 653__ $$acement plant, clinker production line, alternative heating systems, waste heat recovery

000022827 7112_ $$aEngineering Mechanics 2018$$cSvratka, CZ$$d2018-05-14 / 2018-05-17$$gEM2018
000022827 720__ $$aNawrot, A.$$iPochwała, S.$$iStęplowski, S.
000022827 8560_ $$ffischerc@itam.cas.cz
000022827 8564_ $$s891060$$uhttps://invenio.itam.cas.cz/record/22827/files/577.pdf$$yOriginal version of the author's contribution in proceedings, page , section FLU.
000022827 962__ $$r21225
000022827 980__ $$aPAPER