Flow conditions in the last stage during idling operation and low output of 1000MW turbine


Abstract eng:
Measurement of temperatures at the tip of the last stage during startup and idle operation of the turbine with nominal output of 1000 MW is described. Monitoring of liquid phase coarse dispersion occurrence, the direction of drops movement and investigating whether the origin of the drops comes from the natural expansion of steam in the stage or from an additional cooling system is presented. The flow of the steam phase behind the last stage is determined.

Contributors:
Publisher:
Institute of Theoretical and Applied Mechanics, AS CR, Prague
Conference Title:
Conference Title:
Engineering Mechanics 2012
Conference Venue:
Svratka (CZ)
Conference Dates:
12/05/2014 - 15/05/2014
Rights:
Text je chráněný podle autorského zákona č. 121/2000 Sb.



Record appears in:



 Record created 2014-12-04, last modified 2014-12-04


Original version of the author's contribution as presented on CD, paper (No. 031).:
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)