Analýza priebehu povodňovej vlny na vodnej stavbe Oreské počas povodne v čase od 26.3.2006 do 1.4.2006


Abstract eng:
Reason of the flood was combination of melting of high snow cover and precipitation. Dam body before coming high-flood-water wave was nearly having finished of building-up, with thin grass. Filling and discharging of dry reservoir was very fast. Efficiency of transformation of discharge wave below dry reservoir was very high and it achieved the decreasing from 22 to 7 m3s-1. During running of flood unacceptable phenomena appeared which resulted from used material on building-up dam body. Following measures were taken after flood: - Sealing-off dam body by underground sealing wall around safety spillway. By reason of increase in capacity of the footstone drain (elimination compressive schedule in drain) parallel foot drain was build. New drain is interconnected with the existing drain.

Contributors:
Publisher:
Slovak University of Technology in Bratislava, Faculty of Civil Engineering, 2008
Conference Title:
Conference Title:
International Scientific Conference 70 Years of FCE STU
Conference Venue:
Bratislava (SK)
Conference Dates:
2008-12-04 / 2008-12-05
Rights:
Text je chráněný podle autorského zákona č. 121/2000 Sb.



Record appears in:

 Record created 2014-11-05, last modified 2014-11-18


Original version of the author's contribution as presented on CD, . :
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)