Abstract eng:
The authors are developing a new retrofitting system for relatively low seismic performance existing buildings, especially for soft-first-story buildings. The new column, which has the base-isolation system at its middle height, is attached to the existing column by the compression force with the PC bars. The existing column will fail in shear during an earthquake, and then the building becomes to be base-isolated. One of the big advantages of this system is that the retrofitting cost can be low compared to the conventional base-isolation retrofitting technique, since the existing columns do not have to be cut prior to an earthquake, which costs a lot. However, the vertical and lateral loads need to be transferred from the existing column to the newly attached column through the connection surface by the friction. In order to design the post-tension force required to the PC bars (the compression force required to the connection surface), the force carrying mechanism at the connection surface under the vertical and lateral loads needs to be studied. Therefore, a series of experimental tests were conducted to propose and verify a connection design criteria. Seismic retrofitting, Punching shear, Torsional moment, Base-isolation

Contributors:
Conference Title:
Conference Title:
14th World Conference on Earthquake Engineering
Conference Venue:
Bejing (CN)
Conference Dates:
2008-10-12 / 2008-10-17
Rights:
Text je chráněný podle autorského zákona č. 121/2000 Sb.



Record appears in:



 Record created 2014-12-05, last modified 2014-12-05


Original version of the author's contribution as presented on CD, Paper ID: 05-06-0031.:
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)