Development of a Multi-Agent Simulator of Electric Power Distribution Equipment Damage Restoration Process


Abstract eng:
We propose a multi-agent simulator of an electric power distribution equipment damage restoration process due to a disaster. In the proposed simulator, the agents, who imitate the restorer, are modeled by extracting main work steps of the actual restoration process. The major functions of the proposed simulator are 1) to imitate the restoration process, 2) to estimate the alternative strategy, and 3) to improve the restoration time estimation by adding the damage information reported by the inspector. In this paper, we show an outline of the prototype and demonstrate numerical examples to confirm the effectiveness.

Contributors:
Conference Title:
Conference Title:
14th World Conference on Earthquake Engineering
Conference Venue:
Bejing (CN)
Conference Dates:
2008-10-12 / 2008-10-17
Rights:
Text je chráněný podle autorského zákona č. 121/2000 Sb.



Record appears in:



 Record created 2014-12-05, last modified 2014-12-05


Original version of the author's contribution as presented on CD, Paper ID: 11-0132.:
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)