MINIMISING OF THE OPERATION COSTS OF POWER TRANSFORMERS
Abstract eng: The paper demonstrates the problem of profitability of 15/0.4 kV transformers replacement. The transformers work with a small coefficient of peak loads on the units with a lower power rating. The discussion includes fixed and variable costs of the transformers and the costs of their replacement under operating conditions.
Contributors:
Publisher:
Brno University of Technology- Institute of Solid Mechanics, Mechatronics and Biomechanics
Conference Title:
Conference Title:
Engineering Mechanics 2014
Conference Venue:
Svratka (CZ)
Conference Dates:
12/05/2014 - 15/05/2014
Rights:
Text je chráněný podle autorského zákona č. 121/2000 Sb.
Record appears in:
Record created 2014-12-04, last modified 2014-12-04