000008857 24500 $$aMINIMISING OF THE OPERATION COSTS OF POWER TRANSFORMERS

000008857 24630 $$n20.$$pEngineering Mechanics 2014
000008857 260__ $$bBrno University of Technology- Institute of Solid Mechanics, Mechatronics and Biomechanics
000008857 506__ $$arestricted
000008857 520__ $$2eng$$aThe paper demonstrates the problem of profitability of 15/0.4 kV transformers replacement. The transformers work with a small coefficient of peak loads on the units with a lower power rating. The discussion includes fixed and variable costs of the transformers and the costs of their replacement under operating conditions.

000008857 540__ $$aText je chráněný podle autorského zákona č. 121/2000 Sb.
000008857 653__ $$aPower transformer, Operating costs, Peak load coefficient.

000008857 7112_ $$aEngineering Mechanics 2014$$cSvratka (CZ)$$d12/05/2014 - 15/05/2014$$gEM2014
000008857 720__ $$aPerczyński, D.$$iKolber, P.$$iWawrzyniak, S.
000008857 8560_ $$ffischerc@itam.cas.cz
000008857 8564_ $$s628339$$uhttps://invenio.itam.cas.cz/record/8857/files/108-Perczynski-CD.pdf$$yOriginal version of the author's contribution as presented on CD, paper No. 108.