1.
|
The water structure Ladmovce is designed on the Bodrog River in rkm 58,180 as a river project. The main purpose of the planned WS Ladmovce is to provide sufficient naviga [...]
|
2.
|
One of the important elements in the hydropower plant’s pre-operating process is the computation and operation at modelling using the optimizing model. The optimizing m [...]
|
3.
|
At the presen time, as in the pre-operating process as the hydropow plant’s operative managmen is required the load-energy correction (load and safety load duration) in [...]
|
4.
|
Department of Hydraulic Engineering at Slovak University of Technology evolves the software for simulation of vessel routing when the vessel is influenced by force activi [...]
|
5.
|
Within The INTERREG III A Community Initiative 2000 - 2006 Neigbourhood Programme “Zemplin water way“ project has been developed. It contains the conceptual framework [...]
|